To the central content area

The water pollution control and management project for the industrial park sewer system

Absrtact
This is a one-year master regulatory and management planning project for industrial park water pollution control planning, with its major tasks on: conducting functional inspections for the industrial park’s wastewater treatment plants and tracking the follow-up improvement conditions; evaluating the priorities for total quantity limits of water pollution reduction at industrial parks; assisting to establish the industrial parks’ CWMS protocol and to provide technical support; upgrading the Managing System for Water Pollution according to the revisions of relevant water pollution control regulations and assessing the control auditing data; making comments on specific case study about illegal profits from water pollution violation by presenting papers on periodicals; and other administrative assistance works including seven different kinds of works. This project has accomplished the following outcomes:(1)assisting the selections of 20 industrial park wastewater sewer systems for functional inspection to complete the functional inspections as well as tracking the follow-up improvement conditions, (2)completing the assessment forms for self-evaluation of industrial park facilities according to Supplementary Provisions of the Water Pollution Control Measures and Test Reporting Management Regulations and conducting analysis of the returned data and 10 industrial parks’ effluent water quality long-term variations survey, (3)completing the analysis for industrial parks’ effluent quantity and total heavy metals, as well as the water quality analysis for heavy metals at upstream/downstream, and the provision of suggestions regarding priority for total quantity limits control of water pollution, (4)establishing the industrial parks’ CWMS planning, expert consultation meeting, and making implementation presentations to industrial parks and EPBs respectively, (5)upgrading the water pollution management systems according to the revisions of permit/DMR of industrial parks, and analyzing administrative management data/index, (6)assisting to make comments on specific case study for the surrendering of illegal profits from water pollution violation by presenting papers on periodical, and holding expert consultation meeting to gather experts suggestion, (7)other administrative assistances.
Keyword
Industrial park;functional inspection;The survey of facilities of industrial parks according to Supplementary Provisions;total quantity limits of water pollution;continuous water monitoring system(CWMS);permit;DMR;the managing system for water pollution;water pollution control measures;illegal profits
Open
top